Warwick Castle
Client: Warwick Castle
Project Location: Warwick
Value: £250,000
Form of Tender: Design & Build
Members of the Idess team delivered a project of bespoke hand made heritage works for “Kingmaker” at Warwick Castle, Surveying and manufacturing templates to the National monuments existing infrastructure. The Oak door frames were lined with cork and were produced in absolute period detail before being installed to the castle apertures. Finished in beeswax and traditional vegetable based paints other works included the creation of the cloisters, covered ramparts with cedar cut pan tiles from fully sustainable forest sources and a series of oak floors to the castle interior walkways.
Services included; Heritage joinery ● Bespoke oak doors ● Cedar pan tiles ● Cloister recreation ● Oak floors ● Hand made period ironmongery ● Display works to Kingmaker ● Installation undertaken in a grade 1 national monument.





